10.Cleaning & Final Inspection
- 1.Grinders are used to ensure excess lumps are removed and a consistent final coat is achieved.
- 2.Wiring markings are cleaned andtouched up with zinc rich paint.
- 3.The elements are inspected to ensure freedom from gross Imperfections.Faults are reportedtothe Quality Inspector who investigates and determines whether to reject the article.
- 4.Elements, which are rejected and reworked, are inspected.
- 5.Coating thickness is measured with a calibrated Elcometer and recorded onthe Element Inspection Record. This final inspection record is treated asthe release note for dispatch.
- 6.An adhesion check generally implies that the element can withstand normal handling. Normal handling doesnot include bending, curving and working. When required, adhesion is carried out with the help ofa pivoted hammer.
- 7.Coating certificates are provided if requested.
- a.Visual Inspection: 100%
- b.Coating Thickness Checking: 100%
- c.Coating Thickness Recording: In batches of 5 readings each